SRINAGAR CITY
CONSTRUCTION OF NEW MEHJOOR BRIDGE AND TWO GRADE SEPARATOR IN SRINAGAR CITY
Work By J&K ERA Kashmir.Work By J&K ERA Kashmir.
Work By J&K ERA Kashmir.Work By J&K ERA Kashmir.
27-05-2015 ~ 26-05-2017
AIRFORCE STATION
PROV. OF TECH. ACC AT AIRFORCE STATION, SRINAGAR (J&K)
Work By SAM INDIA Built Well Pvt Ltd.
Work By SAM INDIA Built Well Pvt Ltd.
01-09-2012 ~ 31-12-2015
UNIVERSITY OF KASHMIR
CONSTRUCTION OF NEW ADMINISTRATION BLOCK (P.E.B. STRUCTURE) AT MAIN CAMPUS UNIVERSITY OF KASHMIR
01-03-2017 ~ 24-10-2018
SONEPAT KHARKHAUDA
CONSTRUCTION OF ADDITIONAL 2-LANE ROB ADJOINING TO THE EXISTING ROB NO. 71 ON SONEPAT KHARKHAUDA ROAD AT CLOSED LEVEL CROSSING NO. 26-B AT SONEPAT IN SONEPAT DISTT.
Work By PWD Sonipat
Work By PWD Sonipat
12-03-2014 ~ 31-01-2017
JHAJJAR DISTRICT
CONSTRUCTION OF LANE ROB AT LEVEL CROSSING NO. 31-C ON DLI-BTI RAILWAY LINE AT RD 38.100 OF KHARKHODA ASSAUDHA ROAD TEHSIL BAHADURGARH IN JHAJJAR DISTRICT.
Work By Provincial Division PWD (B&R) BR Delhi Rohtak Road
Work By Provincial Division PWD (B&R) BR Delhi Rohtak Road
29-06-2013 ~ 31-03-2016
RAILWAY STATION NIZAMPUR YARD
CONSTRUCTION OF 2 LANE ROB AT LC NO.53 AT KM 66/4-5 ON ROAD FROM NIZAMPUR TO NANGAL CHAUDHARY FALLS ON RAILWAY STATION NIZAMPUR YARD
Work By PWD Buildings & Roads Government of Haryana
Work By PWD Buildings & Roads Government of Haryana
22-02-2017 ~ 30-11-2019
DELHI-REWARI SECTION
CONSTRUCTION OF 4 LANE ROB WITH 1X76.120 M C/C SPAN BOW STRING GRIDER HAVING 9.5 M WIDE CARRIAGEWAY AND LIMITED HEIGHT SUBWAY (INTERNAL SIZE 5.00 X 3.50 M) IN LIEU OF LC NO. 31 AT KM. 40/4-5 ON DELHI-REWARI SECTION NEAR GARHI-HARSHARU RAILWAY STATION.
Work By Indian Railways
Work By Indian Railways
26-06-2019 ~ 31-03-2022
STATION BHUJ
WIDENING/RE-SURFACING AND AND ASSOCIATED WORKS FOR AIR CRAFT DISPERSAL AND FUNCTIONAL OVER LAY OF RUNWAY AND CONSTRUCTION OF ADDITIONAL LINK AT BOTH ENDS OF RUNWAY AND WIDENING OF "L" LINK AT AF STATION BHUJ".
Work By Military Engineer Service
Work By Military Engineer Service
15-02-2019 ~ 16-04-2022
GANDERBAL
DESIGN AND CONSTRUCTION OF 2 LANE BRIDGE AT WAYIL GANDERBAL INCLUDING CONSTRUCTION OF APPROACH ROADS AND NALLAH TRAINING WORKS.
Work By Govt Of J&k R&B Ganderbal Division.
Work By Govt Of J&k R&B Ganderbal Division.
23-04-2019 ~
UNIVERSITY OF KASHMIR
CONSTRUCTION OF SCIENCE BLOCK AT LEH
05-08-2013 ~ 03-02-2015
MILITARY ENGINEER SERVICES
WIDENING OF EXISTING ROAD INCLUDING ROADSLEADS TO RUNWAY AND PTT/WSA AT AIR FORCE STATION
04-08-2011 ~ 31-03-2013
J&K TOURISM DEVELOPMENT CORPORATION
RECONSTRUCTION OF IST FLOOR OF GUTTED BUDSHAH HOTEL
24-08-2010 ~ 25-07-2013
JAMMU AND KASHMIR ECONOMIC RECONSTRUCTION AGENCY
CONSTRUCTION OF 1X21 MTR SPAN KIRKADAL BRIDGE ON BIJBEHARA-LANGANGANBAL ROAD
01-05-2010 ~ 30-06-2012
IRCON INTERNATIONAL LIMITED
BALANCE WORK OF MINORBRIDGES/SUPER PASSAGES AND OTHER MISCELLANEOUS WORK BETWEEN KM 166/800 TO KM 168/100 IN ZONE VI PACKAGE : BR -2
06-04-2010 ~ 31-02-2012
IRCON INTERNATIONAL LIMITED
CONSTRUCTION OF BALANCE WORKS OF MINOR BRIDGES / SUPER PASSAGES AND OTHER MISCELLANEOUS WORKS BETWEEN KM 166/800 TO 168/100 IN ZONE - VI (PACKAGE BR-2) ON DHARAM - QAZIGUND SECTION OF UDHAMPUR -SRINAGAR- BARAMULA NEW BG RAILWAY PROJECT.
06-04-2010 ~ 05-07-2011
IRCON INTERNATIONAL LIMITED
CONSTRUCTIOPN OF BRIDGE NO 149 AND BALANCE WORKS OF EARTH WORKS IN CUTTING, SUB SURFACE DRAINAGE, RCC/RRM RETAINING WALLS, BLANKETING, CATCH WATER DRAINS/IRRIGATION CHANNELS, DIVERSION OF NALLAH AND OTHER MISCELLANEOUS WORKS BETWEEN KM 163/810 TO 164/220 IN ZONE VI ( PACKAGE BR-10 ON DHARAM - QAZIGUND SECTION OF UDHAMPUR-SRINAGAR-BARAMULLA NEW BG RAILWAY LINE PROJECT
31-03-2010 ~ 20-03-2013
IRCON INTERNATIONAL LIMITED
BALANCE WORK OF EARTH WORK IN CUTTING INCLUDING CONSTRUCTION OF SUB SOIL DRAIN, SIDE DRAIN, CATCH WATER DRAIN ETC. AND OTHER MISCELLANEOUS WORKS IN QAZIGUND YARD (PACKAGE BR-26R) ON QAZIGUND-BARAMULLA NEW B.G. RAIL LINE PROJECT
22-01-2009 ~ 07-04-2010
IRCON INTERNATIONAL LIMITED
BALANCE/ADDITIONAL WORK OF CONSTRUCTION OF MINOR BRIDGE, APPROACH ROAD AT ROAD OVER BRIDGE (ROB-10) AT SANGAM (KM 6/016) AS PER APPROVED DRAWING ON QAZIGUND - BARAMULLA NEW BG RAIL LINE PROJECT
10-12-2008 ~ 10-10-2009
IRCON INTERNATIONAL LIMITED
CONSTRUCTION OF 80 BEDDED RPF BARRACKS AND OTHER MISCELLANEOUS WORKS SUCH AS CHAIN LINK FENCING ETC AT RAJWANSHER RAILWAY STATION YARD (PACKAGE RPF-05) ON Q-B SECTION OF NEW BG LINE PROJECT (J&K).
17-09-2008 ~ 16-01-2009
IRCON INTERNATIONAL LIMITED
CONSTRUCTION OF TRACK MACHINE SHED AND SATELLITE DIESEL SHED AT BUDGAM STATION (PACKAGE OB -13) ON QAZIGUND-BARAMULA NEW B.G. RAIL LINE PROJECT
05-05-2008 ~ 30-06-2009
TOURISM M&W SINAGAR
CONSTRUCTION OF TOURIST RECEPTION CENTRE AT NOWGAM SRINAGAR
25-04-2008 ~ 30-05-2010
IRCON INTERNATIONAL LIMITED
CONSTRUCTION OF MISCELLANEOUS EXTERNAL DEVELOPMENT WORKS SUCH AS ROAD WORK, DRAIN WORK ETC., ON STATION BUILDING SIDE AT BUDGAM STATION (PACKAGE M-7) ON QAZIGUND-BARAMULLA SECTION
02-08-2007 ~ 31-05-2008
SHERI KASHMIR INSTITUTE OF MEDICAL SCIENCE
CONSTRUCTION OF ADVANCE CENTER FOR GENETIC DISEASES AT SKIMS SOURA SRINAGAR
07-11-2006 ~ 09-04-2007
IRCON INTERNATIONAL LIMITED
CONSTRUCTION OF OVERHEAD SMC PANEL TANK AT RAJWANSHER, PATTAN, SOPORE AND AWANTIPORA ON QAZIGUND-BARAMULLA NEW BG RAIL LINE PROJECT
17-05-2006 ~ 31-12-2007
IRCON INTERNATIONAL LIMITED
CONSTRUCTION OF INSPECTION & MAINTENANCE DMU SHED FOR 8 COACH (2X200 MTRS 12.70 MTRS.) AT BUDGAM ON QAZIGUND - BARAMULLA NEW B.G. RAIL LINE PROJECT
17-02-2006 ~ 30-04-2007
IRCON INTERNATIONAL LIMITED
CONSTRUCTION OF DMU SHED FOR 8 COACHES AT BUDGAM IN QAZIGUND BARAMULLA NEW B.G. RAILWAY LINE PROJECT
17-02-2006 ~ 16-02-2007
IRCON INTERNATIONAL LIMITED
CONSTRUCTION OF ROAD OVER BRIDGES AND ROAD UNDER BRIDGES WITH RCC ABITMENTS AND PIERS AS PER APPROVED DRAWINGS FROM KM0.750 TO KM 15.00 ( ZONE BR-10 A) ON QUAZIGUND BARAMULLA NEW B.G. RAIL LINE PROJECT
20-09-2005 ~ 30-06-2008
J&K TOURISM DEVELOPMENT CORPORATION
CONSTRUCTION OF ROOFING OF TOURIST BLOCK (LUXURY HOTEL) AT TRC, SRINAGAR OVER EXISTING ROOF SLAB
15-03-2005 ~ 24-09-2007
IRCON INTERNATIONAL LIMITED
CONSTRUCTION OF 11 NOS. SINGLE LINE RAILWAY BRIDGES ACROSS RIVERS, CANALS,FLOOD OPENINGS, ROAD ETC. WITH WELL / RAFT FOUNDATIONS, RCC ABUTMENT AND PIERS AS PER APPROVED DRAWING (ZONE BR-8) FROM KM 25.00 TO KM 45.00 ON QAZIGUND - BARAMULLA NEW RAILWAY LINE PROJECT (J & K)
06-02-2003 ~ 31-12-2006
IRCON INTERNATIONAL LIMITED
EARTH WORK IN EMBANKMENT & OTHER PROTECTION WORKS(ZONE E-10) BETWEEN KM 54.800 TO 56.600 ON QAZIGUND - BARAMULLA NEW RAILWAY LINE PROJECT
24-01-2002 ~ 06-11-2004
IRCON INTERNATIONAL LIMITED
PACKAGE A-1 EARTHWORK ETC. IN EMBANKMENT FOR THE CONSTRUCTION OF RAILWAY YARD AT KAKAPORA
01-05-2001 ~ 06-11-2004
BHARAT HOTELS LIMITED
CONSTRUCTION OF EIGHT COTTAGES, HEALTH CLUB AND SWIMMING POOL AT HOTEL THE GRAND PALACE, SRINAGAR
05-12-1998 ~ 05-12-1999
RITES
CONSTRUCTION OF BUILDING INCLUDING ELECTRICAL WORKS AND EXTERNAL SERVIES FOR NATIONAL SERICULTURE PROJECT OF F-1 GRAINAGE COMPLEX AT LADAN, UDHAMPUR (J&K)
18-01-1996 ~ 17-07-1997